Commercial clearing
Commercial and Development Clearing in Cumming and Forsyth County
Sawnee Land Clearing clears commercial and development tracts in Cumming, Forsyth County and along the 400 corridor. Silt fence, construction exits, clearing, debris grinding and pad work run on one contract and one schedule, phased to your plan. Any tract disturbing 1 acre or more needs a county land disturbance permit and state stormwater coverage first.
- Phased to your plan
- Erosion control included
- Debris ground on site
- One schedule
What's included
From the perimeter controls to the graded pad
Six pieces of a development clearing job. Your plan set decides which ones we bid.
01Perimeter controls first
Silt fence and a gravel construction exit installed to your erosion plan before the first tree is cut.
02Tree-save areas flagged
Save areas and buffers flagged to the tree protection plan, so machines stay off the roots.
03Clearing by phase
Each phase cleared when you're ready to build on it. Ground you won't touch for months stays wooded.
04Mulch where it can stay
Open space, lot edges and later phases mulched in place, which keeps cover on the clay.
05Grubbing and grinding
Roads and pads grubbed. Trunks and stumps run through a horizontal grinder on site instead of hauled.
06Pads and roadbeds
Rough grading for building pads and road corridors, ready for your grading sub or the next trade.

One schedule for clearing, erosion control and pads.
Your schedule
Cleared in the order you build.
We bid from the approved plan set and work to your sequence. Your superintendent deals with one contractor for the fence, the clearing, the grinding and the pads.
Phases you won't build on for a season grow back in sweetgum and briars. We can mow them until you're ready.
- Bid from your plan set and erosion plan
- Work sequenced to your phases
- Controls kept up between rains
- One point of contact for your super
The sequence
How a development tract runs, permit to pad
The county hands over the land disturbance permit at the pre-construction meeting. Nothing gets cleared before that.
- 1Bid
Bid from the plans
Civil set, erosion plan, tree plan and your phasing, priced by phase.
- 2Before mobilizing
Pre-construction meeting
Permit in hand, controls and sequence confirmed with you and the county.
- 3Day 1
Perimeter controls in
Silt fence on the low sides and a gravel exit at each entrance.
- 4Per phase
Clear and grind by phase
Mulched where cover can stay, grubbed and ground where pads and roads go.
- 5Through the job
Controls kept up
Ready for inspections at least weekly on most sites, and within 24 hours of a half-inch rain.
- 6Handoff
Hand off the phase
Pads rough-graded, controls standing and the phase walked with your super.
One contract
One contractor for the clearing scope
A single-machine operator clears. Your super still has to find the erosion, grinding and pad subs.

Forsyth County rules
The permit numbers on a Forsyth County tract
Development clearing here runs under the county's land disturbance permit and Georgia's stormwater permit. We price the controls into the bid.
What is a land disturbance permit?- 1 acre
- Disturbance that triggers the county permit and state stormwater coverage
- $80
- Most the state NPDES fee can be, per disturbed acre
- 50 + 25 ft
- Forsyth County undisturbed stream buffer plus setback
- $250
- Forsyth County's listed clearing and grubbing permit fee
Permit thresholds, fees and buffer widths are those published by Forsyth County and the State of Georgia as of November 4, 2026. Confirm current requirements with the issuing authority before work begins. This is not legal advice.
Cost
What development clearing costs, and what moves the number
Large tracts price lower per acre because one mobilization covers more ground. Grubbing and grading cost more than mulching.
Mulched or grubbed
Ground that stays green mulches cheap. Pads and roads need stumps out.
Trunk size and density
Mixed pine and hardwood with 8 inch trunks and up slows every machine.
Phasing
Each extra mobilization adds a trailer move and set-up time.
Erosion controls
Fence length, exits and the upkeep the plan calls for.
Slope and rock
Piedmont slopes and rock under the clay slow grading.
Wet weather
Saturated red clay stops tracked machines until it firms up.
Estimated ranges around Cumming
- Clearing by mulching
- $1,200 to $6,500+/acre
- Clear, grub and haul
- $3,500 to $8,000/acre
- Grading
- $1,200 to $3,500/acre
- Silt fence
- $500 to $1,200/acre
- Machine day rate
- $1,800 to $3,000/day
Ranges are estimates for Forsyth County and the surrounding area based on job density, terrain, access and acreage. Your written quote is the only price that applies to your property.
Land clearing cost per acreWho it's for
Who calls us for development clearing
Straight answers